Chalk LineGROUP
Commercial interiors subcontractor · Charleston, SC

Planned with Purpose.Built with Precision.

Chalk Line Group frames and finishes commercial interiors for general contractors across the Lowcountry. Metal framing, drywall, ceilings, and specialty panels, led by an owner who has worked commercial drywall in Charleston since 2017, from the field to the PM chair to running preconstruction.

PlanCoordinateBuildDeliver
Sheet A-1 Leadership

Built by someone who's done every seat

Austin Edens, President of Chalk Line Group
Austin EdensPRESIDENT

Austin Edens has worked commercial drywall and metal framing in Charleston since 2017. He started in the field, ran projects as a PM, Senior PM, and Project Executive, and most recently led preconstruction as a Vice President before founding Chalk Line Group.

That path means he understands how work is physically built and how it has to be selected, priced, contracted, staffed, and managed to finish well. He knows manpower, sequencing, and material flow from the field. From operations he knows cost-to-complete forecasting, change management, and owning the outcome. Preconstruction taught him to scope a job completely and price it so it can actually be built for that number.

He also helped scale a startup specialty contractor more than tenfold in annual revenue while keeping margins strong. Chalk Line Group is built on the same disciplines: selective pursuit, accurate preconstruction, clear communication, and dependable field execution.

Since 2017In Charleston commercial drywall and metal framing
10×+Revenue growth he helped lead at a startup specialty contractor
1 callThe owner bids your job and stays on it through closeout
Career path · Austin EdensField → Operations → Preconstruction → Owner
2017Field AssociateFraming, drywall, and ceiling systems
2018Onsite PMSubmittals, RFIs, daily GC coordination
2019 – 2024PM → Sr. PM → Project ExecProject financials, scheduling, change management, cost-to-complete
2024 – 2026VP of Pre­constructionPricing strategy, scope review, GC relationships, backlog
2026FounderChalk Line Group
OSHA 30 CertifiedCPI Daylighting Certified InstallerABAA Evaluated · SecuRock ExoAir 430Field-trained: framing, drywall, ACT & wood ceilings
Sheet A-2 Scope

What we self-perform

Organized the way your bid form is. One sub for the whole interior package, from the first chalk line to the last ceiling tile.

FramingSTRUCTURE & LAYOUT

  • 01 71 23
    LayoutField layout from the architectural plans and RCP, coordinated with MEP before a stud goes up.
  • 05 40 00
    Exterior framingCold-formed metal framing for exterior walls and soffits.
  • 09 22 16
    Interior framingNon-structural partitions, rated and shaft wall assemblies, bulkheads, and in-wall blocking.
  • 07 21 00
    InsulationBatt and acoustic insulation in wall and ceiling assemblies.

DrywallBOARD & FINISH

  • 09 29 00
    HangGypsum board, moisture- and abuse-resistant board, and fire-rated assemblies built to the listed design.
  • 09 29 00
    FinishTape and finish to the specified level, Level 4 through Level 5.

CeilingsGRID, TILE & SPECIALTY

  • 09 51 00
    ACT grid & tileSuspension systems and acoustical tile, coordinated with lights, diffusers, and sprinkler heads.
  • 09 54 00
    Specialty ceilingsWood, metal, and specialty ceiling panels and clouds.

SpecialtyWALLS & PANELS

  • 09 77 00
    Specialty wall panelsAcoustic and decorative wall panel systems.
  • 06 64 00
    FRPFiberglass reinforced panels, furnished and installed.
Sheet A-3 Markets

Where we build

We work for general contractors on commercial, healthcare, and industrial projects in the Charleston region, including Charleston, Berkeley, and Dorchester counties.

Market 01

Healthcare

Clinics, medical office buildings, and work inside occupied facilities, where dust, noise, and schedule matter as much as the walls.

  • ICRA-aware work practices
  • Rated partitions and shaft walls
  • Phased and after-hours sequencing
Market 02

Commercial

Office, retail, hospitality, and tenant fit-outs where finish quality is what the owner sees on day one.

  • Tenant improvements and buildouts
  • Level 5 finish where specified
  • Specialty ceilings and feature walls
Market 03

Industrial

Manufacturing plants and industrial facilities, including offices, break rooms, and support spaces inside the plant.

  • In-plant offices and support spaces
  • Abuse-resistant board and FRP
  • Work around active operations
Sheet A-4 Sequence

How we run a job

The same four steps on every project, so your superintendent always knows where we stand.

  1. Step 01

    Plan

    Detailed takeoff, scope clarifications, and a lump-sum number broken out the way your bid form needs it.

  2. Step 02

    Coordinate

    Submittals, schedule, and above-ceiling coordination with MEP. Every wall snapped and checked before material is staged.

  3. Step 03

    Build

    Framing, board, and finish to the rated design and specified finish level, ready for each inspection on time.

  4. Step 04

    Deliver

    Ceilings and specialty panels, then a punch list closed out without reminders and a clean turnover.

Sheet A-5 Commitments

What you can expect from us

These are practices we track every month, not slogans.

Preconstruction

Complete scope, honest numbers

Full takeoffs, a complete scope review, and realistic labor assumptions on every bid, with risks and clarifications called out up front, before they show up as change orders.

Relationships

One owner, accountable

You deal with the person who priced your job. Every GC relationship has a named owner at Chalk Line, and that person answers the phone.

Execution

Problems surfaced early

Monthly cost-to-complete forecasts on active projects and labor tracked against the estimate by activity. Your team hears about schedule and cost issues early, not at closeout.

Financial strength

Here for the whole job

We take on work at a pace our working capital supports, with a rolling 13-week cash forecast behind it. Your project won't be one too many for us.

Sheet A-6 Prequalification

Ready for your vendor list

We'll send a complete prequalification package for your files. Ask for it with your bid invite or any time before award.

Request our prequal package
  • Certificate of insuranceOn request
  • W-9On request
  • South Carolina license informationOn request
  • Written safety programOn request
  • ReferencesOn request
Sheet A-7 Bid invites

Invite us to bid

Send plans and a bid date. We confirm receipt and tell you whether we're bidding, so you're never left guessing.

Austin EdensPRESIDENT
austin@chalklinegroupllc.com
P.O. Box 2103 · Charleston, SC 29412

Goes straight to Austin's inbox.